Napoleon-fireplaces Vector 45 - LHD45 User Manual Page 82

  • Download
  • Add to my manuals
  • Print
  • Page
    / 120
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 81
W415-0834 / D / 06.27.13
FR
82
Le système d’évacuation doit être soutenu à peu près tous les 3 pieds (0.9m) de courses verticales et horizontales.
Utilisez l’ensemble de support mural Wolf Steel ou des supports incombustibles équivalents a n de conserver le
dégagement minimal aux matériaux combustibles pour les courses verticales et horizontales.
Tous les joints des conduits intérieurs et extérieurs peuvent être scellés avec du scellant de silicone rouge à haute
température W573-0002 (non fourni) ou du scellant noir à haute température Mill Pac W573-0007 (non fourni) à
l’exception du raccordement du conduit d’évacuation à la buse de l’appareil qui doit être scellé avec le scellant
Mill Pac.
25.1A
4.1.2 INSTALLATION VERTICALE
This application occurs when venting through a roof. Installation kits for
various roof pitches are available from your authorized dealer / distributor.
See accessories to order speci c kits required.
A. Determine the air terminal location, cut and frame a square opening as
illustrated in the ceiling and the roof to provide the minimum 1” (25mm)
clearance between the vent pipe and any combustible material. Try to center
the vent pipe location midway between two joists to prevent having to cut
them. Use a plumb bob to line up the center of the openings. A vent pipe
shield will prevent any materials such as insulation, from lling up the 1”
(25mm) air space around the pipe. Nail headers between the joist for
extra support.
B. Apply a bead of caulking (not supplied) to the framework or to the Wolf
Steel vent pipe shield plate or equivalent (in the case of a nished ceiling),
and secure over the opening in the ceiling. A restop must be placed on the
bottom of each framed opening in a roof or ceiling that the venting system passes
through. Apply a bead of caulking all around and place a restop spacer over
the vent shield to restrict cold air from being drawn into the room or around the
replace. Ensure that both spacer and shield maintain the required clearance to
combustibles. Once the vent pipe is installed in its nal position, apply sealant between the
pipe and the restop assembly.
C. In the attic, slide the vent pipe collar down to cover up the open end of the shield and
tighten. This will prevent any materials, such as insulation, from lling up the 1” (25mm) air
space around the pipe.
21.1
CAULKING
VENT PIPE
SHIELD
FIRESTOP
UNDERSIDE OF
JOIST
VENT
PIPE
COLLAR
VENT
PIPE
SHIELD
9 3/4”
9 3/4”
4.2 UTILISATION DE COMPOSANTS RIGIDES D’ÉVACUATION
Page view 81
1 2 ... 77 78 79 80 81 82 83 84 85 86 87 ... 119 120

Comments to this Manuals

No comments